R5.0 : Risk: Reliability, Resiliance, Relevance & Relationships

R5 Zero.com
Home
R5zero model & Services
SBI
About
R5 Zero.com
Home
R5zero model & Services
SBI
About
More
  • Home
  • R5zero model & Services
  • SBI
  • About
  • Home
  • R5zero model & Services
  • SBI
  • About

The R5.0 Model and Engineering Services by R5 Zero

Risk

Reliability

Reliability

Creating a RISK model


The output of the Model has the aim of managing risk and reducing the cost of risk.


Actionable insights

Reliability

Reliability

Reliability

Reliability Block Diagrams

RCM, RAMS, Condition Monitoring and Predictive Analysis Tools





-Scroll Down for more information -


Resilience

Reliability

Resilience

ISO55001 (Asset Management Standard) 

ISO41001 (Facility Management Standard)

ISO50001 (Energy Management Standard)

ISO14001 (Environmental Management)    

Asset Maturity Audits 

Processes are in place 

Digitising Maintenance Knowledge:            

     Asset Audits; BIM; Collect and Code; Photographs; manuals; Software backups; MRO & Supply chain.

Relevance

The Safe Air Zone : Mould, Ventilation, Air quality

Resilience

Relevant Assets

Whole of Life Models (Base Life, Degradation curves, Realistic Replacement Values)

Full Cost at Completion Modelling.

Workable intuitive CMMS

Sensible PM's

Sensor Inventory, and Sensor Management

Correct Measurements at the correct frequency.

Keeping updated on Legislation changes, reporting requirements and new Standards.

Relationships

The Safe Air Zone : Mould, Ventilation, Air quality

The Safe Air Zone : Mould, Ventilation, Air quality

Training  

Engaged

Enabled 

SMART goals,

Coaching

Failure Codes          

History of events,    

Voice (are we listening?)

Thankyou (are we celebrating success?)

The Safe Air Zone : Mould, Ventilation, Air quality

The Safe Air Zone : Mould, Ventilation, Air quality

The Safe Air Zone : Mould, Ventilation, Air quality

Just when you thought it was safe to enter!

MOULD  & Air Quality 

Key products have come to define 

how we manage facilities differently.

In this Zone you will discover 

how we establish safe environments 

with innovations in:


Air Quality & Comfort

Measuring and maintaining safe zones

Tell me more !

Energy Management & Sustainability Reporting

The Quick Energy Audit

Reducing Waste and Cost

Understanding Energy Use

ISO50001 (Energy Management Standard)


Measuring and understanding

Innovative Solutions

Demand Management

Power factor correction

Phase balance

Backup Power


(Thermal Storage like Ice Tanks or increasing hot water tanks, Off Peak operations, Peak Lopping and utilisation, Air Receiver management and much more)



- A whole Energy & Sustainability Page 

coming soon -

Jump to Energy & Sustainability

SBI

Specialised Service

SBI - Safe Battery Investigations


& Blog on Battery fires, Explosions, tests, trends and much more


more useful information to Download

To: our SBI page with blog

Project Management, Innovation and Technology

Project Management, Innovation and Technology

Project management,

Innovation

Mechanical Engineering Services 

Specialist Advice

Expert Witness: Forensic Engineering,

Reconstruction of Accidents and Mechanical Failure investigations.

Specialised Audits eg: Safe Battery Investigations (see above )

Part 1 to 5: The R5.0 Model in more detail

Risk

 The other 4 R's drive the Risk Model.


Introducing: R5.0 or R5Zero  Modeled on Industry 5.0

Reliability in asset management is in basic terms the inverse of the level of risk (high reliability = low risk of failure)

Resilience is the ability to reduce Likelihood and the severity of the Consequence of a failure

Relevance is both the Consequence and the financial driver to priorities.

Relationship is the People who make it happen (or not!)


R5.0 provides a holistic approach to Asset Management and Services bringing together robust processes to deliver value all while thinking abo


Risk Models are based on ISO31000 (Risk Management Standard)

Understanding the Cost of Risk and Establishing what an organisations apatite for risk is.


For all projects and ventures a  risk matrix is required and risk control measures established.

For Sustainability projects opportunities and risks must be established to manage success expectation. Every organisation and project should have a risk register, These registers should be audited for currency, and they should include a field indicating whether the mitigating strategy has been needed and an understanding of the effectiveness of that strategy.


ISO describes Risk as: 'effect of uncertainty.

An effect is a deviation from the expected (positive or negative)


The higher the reliability, the more resilient the asset and the system supporting the asset,

then unexpected events will be far more rare, and have a low or negligible impact.


The higher the consequence of the deviation, the more it is worth investing in predicting it and controlling/preventing it. If unable, insure for the consequence. Either way, there is a cost of Risk.

Where investment is provided to understand and prevent deviations or ensuring the effect is low, Insurers can lower their premiums and there is a lower cost of risk.


Uncertainty is the state, even partial, of deficiency of information relating to, understanding or knowledge of an event, its consequence or likelihood.


For 

Major Hazardous Installations and any mission that is being undertaken, 

Maximum Possible Loss vs Maximum Probable Loss are common risk management calculations.


Reliability

How to build Reliability Block Diagrams (RBD)

Establishing availability Simulations

Completing an RCM (Reliability Centered Maintenance Analysis)

Create a RAMS (Reliability, Availability, Maintainability, Safety) Model

Appropriate for the asset or the mission


Our service delivery partners "PHM Technology" provide a MADe Model

This model is a robust program for digitising knowledge 

From a clear Understanding of the RBD Reliability Block Diagram

And working through the RCM or RAMS process. 


We can facilitate RCM workshops and training and provide useful material and RCM charts

More on RAMS in the download section.


Predictive Analysis - This is the lead time and confidence on asset availability and performance.

Resilience

Definition: " the capacity to withstand or to recover quickly from difficulties; toughness."


Introduction to Asset Maturity Auditing

and Sustainability Maturity auditing.

More about ISO55001 (Asset Management Standard 

and ISO41001 (Facility Management Standard) in the download section.


What is digitising Maintenance knowledge? 

  • ISO19650 - BIM modeling
  • Coding assets 
  • Common Data Environments (CDE)
  • Time based Coded Photographs - more intelligence
  • Managing Asset Knowledge, Manuals, Drawings and As-Builts, Location, 
  • Version control and Backups,


Redundancy and Preparing for replacements and replacement parts 

Codifying Critical Spares

Managing spares and maintaining spares, obsolescence and warranties (on service as well) 


Condition Confidence

Maintenance Effectiveness

  • This is the extent to which planned activities are realised and planned results achieved.
  • This is the choreographed service


Whole of Life (WoL)  Modelling and Lifecycle replacement costing, as well as planning for replacement, refurbishment or scheduled restoration.

Different assets are treated with appropriate models. (Eg: FFE or Furniture Fixtures and Equipment, such as trolleys are high quantity low or medium cost items that make up a significant financial cost base) Resilience means having these coded (preferably tracked - ask us about solutions) and redundancy and replacement spares or supply chain in place.  Paint, carpet, roofs have their own unique modelling appropriate for their scheduled restoration needs.


Whole of Life modelling means including the operating cost such as knowledge, efficiency and cleaning, in the WoL value of the asset.  Understanding the funding needed to mitigate the risk.


FPE (Fixed Plant and Equipment) range from traditional time based maintenance to real-time condition monitoring (as an output of the RCM or Reliability modelling)


A resilient system is planned and scheduled  and the deviation to the plan is measured.


A resilient system includes remaining abreast of the the current legislation, reporting requirements (Especially for Scope 1, 2 and 3 emissions)


Resilient  operations understand the operating parameters of their plant and equipment so energy can be more effectively managed (see Energy Auditing and peak lopping)


Relevance

Appropriate management of the Assets that affect Availability

FMECA (Failure Mode Effect and Criticality Analysis) 

Ensuring that the correct focus is in place, Correctly measuring the right things. 


Ensuring the model makes sense (many low value lifecycle replacements and scheduled restoration assets are different from single high value maintainable assets - see resilience)


We also talk about sensor management (the correct valued sensor with the correct sensitivity, drift, standardisation) - maintaining a sensor library.


Doing the right things at the right time in the right way - every time.


Auditing to ISO50001 (Energy Management Standard) - Finding the energy consumption by priority and establishing disclosures in GRI reporting.


Understanding Criticality and Failure Codes

Measuring the right things

The world of IoT (see the IOT chart and IOT measuring innovations and ideas in the downloads)

Relationships

 People are the key differentiator between Industry 4.0 and 5.0 


The R5zero model brings people back into focus. 


With the automation and robotics to the AI revolution we still need people. 

People is the 3rd pillar in Sustainability and Culture supports sustainability.

In a choreographed service, people are engaged, empowered and enabled (have the correct information, know what to do, and do the right thing - every time.


Coaching & Mentoring


Creating the right Culture

Establishing Service KPI's

Stakeholder Analysis (Download our Stakeholder Engagement Toolbox - below)

Tools and Training and competence

Part 6: Safe Air Zone: Mould & Air Quality in more detail

our Partners : Comfort Zone Ventilation & Coatings.

Air quality: Means the right filtering, air -turns and removal of toxic fumes.

Talk to us about how you could be actual air turns in your  space


Mould growth comes from water and other toxicities that affect Air Quality.

Talk to us about Innovations and remedies for Mould, Insulation and toxic-gasses.


First - seek out the source of the moisture and remedy that.

Comfort zone has innovative "Aerofresh" forced ventilator with a heat recovery unit.

This means you get fresh air, remove moisture without affecting the temperature inside your space.

Innovative sub-floor ventilation with silencers 


Mould-Gone products and treatments with tried and tested results, and the certificates and lab result, awards and accolades. We supply these to trade.


See the product range below: 

use the code r5zero and send us a copy of your order to get a cash back voucher.

Hyperlink to shop for mould products on their site.

Part 7: Energy Management & Sustainability

Energy, Sustainability, Thermal Coatings, Education, Strategy, Guidance

Lets talk about Energy. And the Count down to 2050!   

ISO50001 The Energy Management Standard defines a standard approach to energy management and reporting.


"Quick Energy Audit"  takes you through a gathering of the energy in use, the glaring opportunities or low hanging fruit.  

-  Creates an appreciation and an appetite for more.

Remedies:

  - innovations in revolutionary thermal coatings, 

  - energy recovery units,  

  - measuring energy (see our partners Procept), 

  -  peak lopping and demand management (technical platform enabled)


The Sustainability model:

   -   People, Planet Profit underpinned by Culture.: 

       A delicate balance.

Education: Advice on how to begin creating a sustainability strategy.


ASIC's RG280, What are the Regulatory Guidelines of ASIC when it comes to Sustainability Reporting and climate related disclosures? 

Find our published review paper in the downloads section below.

Innovation: Strategy: Technology Enablement

Perhaps you see a trend: When you work with R5.O you bring together the aspects that make facilities, operations, assets processes more sustainable.


We should have done this 25 years ago, R5Zero can help you accelerate  


The year 5zero is closer than it appears!

People, Process, Platforms

Through Coaching & Change Management,

Building the right Processes &

Implementing Technology Platforms that are intuitive and serve to automate the process and enable the people to do their jobs, is the intersection of innovation and relationships.

People, Process, Performance underpinned by Platforms

Performance is achieved through: People, Process and Platforms

Through Coaching & Change Management,

Building the right Processes & Implementing Technology Platforms that are intuitive and serve to automate the process and enable the people to do their jobs. 

The intersection of innovation and relationships.


Ordinary people achieve great things with great systems.

but it takes extraordinary people to achieve regular outputs with poor systems.

Service Delivery Partners (Key relationships)

Comfort Zone Ventilation & Coatings

Comfort Zone Ventilation & Coatings

Comfort Zone Ventilation & Coatings

 

THE VENTILATION EXPERTS

(and toxic fume removal)

Thermal economisers

Thermal roof Coatings

Mould gone products

To: www.comfortzoneventilation.com.au

Our Network of Partners

Comfort Zone Ventilation & Coatings

Comfort Zone Ventilation & Coatings

We take a collaborative approach to our projects & engagements, working closely with our clients to ensure that we fully understand their needs and can deliver solutions that exceed their expectations.

See our "About Page" to see the types of service lines we've touched. It's not just what you know.. it's who you know!

Get in Touch

Procept

Our Experience

Our Experience

 The Procept Difference – Capabilities cover the energy monitoring and control landscape, from atailored range of IoT products to advice and customisation solutions. 

www.procept.com.au

Our Experience

Our Experience

Our Experience

With over 30 years of experience in the engineering services industry, we have a proven track record of delivering high-quality solutions to our clients. We have worked with companies of all sizes, from startups to Fortune 500 firms.

About Us

Downloads

Mould Gone A4 Brochure with Menu - DK (pdf)

Download

DK Stakeholder Engagement toolbox (docx)

Download

Research and Articles

Files coming soon.

  • Home
  • R5zero model & Services
  • SBI
  • About

R5 Zero

Chat or email for further contact

Copyright © 2025 R5 Zero - All Rights Reserved.

This website uses cookies.

We use cookies to analyse website traffic as a unique user returning visitors and allows the chat function to work.  The data is aggregated with all other user data.

NopeOk